What Does Port Congestion Actually Measure?

8 minute read

In brief

  • Port-congestion measures describe different objects: queues, waiting time, turnaround, capacity, dwell, delay cost, emissions and landside occupancy.
  • A fixed-zone metric can suggest recovery when a holding policy moves waiting vessels elsewhere; backlog, safety and environmental outcomes must be assessed separately.
  • Congestion is modeled as a partly observed operational state shaped by service demand, capacity, variability, priorities and disruption. Location provides evidence about that state.
Synthetic port showing a queue relocation after a holding rule and time series of ships at berth, anchor and holding area
Illustrative queue-relocation stress test. A holding rule changes the spatial footprint of waiting. The test asks whether a congestion measure follows the waiting population beyond the charted anchorage.

A queue can move without congestion changing.

Consider the synthetic scenario illustrated here, an arrival surge builds a queue in charted anchorages. A later holding rule directs incoming vessels beyond a holding line, where they wait by drifting. The figures illustrate the resulting measurement problem, they do not establish performance on operational port data.

If service demand, eligibility, queue discipline and service timing are preserved, a fall in anchorage occupancy reflects a change in the spatial expression of waiting, while the service backlog remains unchanged.

A metric tied to one anchorage polygon can therefore report a smaller local queue without establishing that waiting time or service pressure has improved.

An ideal formulation models port-call congestion as a partly observed operational state, characterised by service backlog, effective capacity and the constraints governing access to service. A queue is one observable expression of that state.

This note focuses on vessel waiting and access to berth service. Landside constraints enter this view where they affect effective service capacity; measuring yard or gate congestion requires additional observations.

There is no single congestion variable

Port-congestion studies address related but different targets. Chen et al. derive operational events, congestion indicators and delay costs from AIS, while Ma et al. investigate waiting behaviour outside ports. Their outputs should be interpreted according to the quantity each method estimates (Chen et al., 2023; Ma et al., 2023).

Quantity What it captures What it can miss
Queue size number of vessels waiting for a specified service differences in workload, eligibility and priority
Waiting time elapsed waiting between defined events the reason for waiting and future backlog growth
Turnaround elapsed port-call time, including movement, waiting and service which component generated additional delay
Operating capacity effective service ability over a specified period constraints omitted from its estimation
Ultimate capacity a saturation limit under stated operating assumptions changes in vessel mix, infrastructure and policy
Dwell / speed indices residence and movement patterns in a monitored area waiting elsewhere and non-congestion reasons for slow movement
Delay cost economic consequences relative to a defined baseline the physical mechanism producing delay
Emissions-at-anchor estimated emissions during anchored activity drifting, manoeuvring and voyage-wide effects

The correct target depends on the decision the model should support. Turnaround is not entirely delay, and a vessel count does not describe the amount of service work queued.

Congestion also does not require average demand to remain above capacity. Variability can produce waiting in a stable queue, and a backlog can remain substantial while it is clearing. Even a basic queueing model has positive expected waiting when average arrival demand is below service capacity (MIT queueing notes).

The moving-queue stress test

The test asks what happens when waiting moves beyond the monitored anchorage. A method that follows service-waiting events should be evaluated across both locations. A measure restricted to the original polygon may fall even if the same vessels still await service.

To isolate this measurement effect, the paired scenarios must preserve service demand, eligibility, queue discipline and service start and completion times. If relocation changes access time or service order, those operational effects must also be measured.

This is a general failure mode: when policy changes where waiting is expressed, a location-defined metric can mistake relocation for recovery.

The operational distinction has a real precedent. The Los Angeles–Long Beach queueing process introduced in November 2021 allowed vessels to retain queue positions while slowing their approach and waiting farther offshore. Its stated objectives included safety and air quality. This demonstrates why local anchorage occupancy and the wider queue need separate interpretation; it does not establish that total waiting was unchanged (Marine Exchange of Southern California, 2022).

Relocation can therefore leave service backlog unchanged while affecting navigation risk, local exposure or fuel use. Those outcomes deserve separate evaluation.

The scenario also motivates a segmentation test. A fixed speed threshold can split a drifting wait when a vessel briefly manoeuvres. Evaluation should measure event fragmentation and boundary errors alongside total waiting duration.

Scatter plot comparing estimated and true vessel waiting time with a daily time-series comparison
Illustrative vessel-level waiting estimates. Aggregate agreement alone does not establish vessel-level accuracy. Evaluation should compare individual event boundaries and waiting durations alongside system-level queues.
Synthetic port during offshore holding with anchoring-stay estimate compared against true ships waiting
Anchoring is an incomplete proxy for waiting. This synthetic scenario illustrates how an anchoring-based measure can miss vessels waiting by drifting outside its monitored area.

Queue models are useful—but assumptions matter

Queueing formulations add structure: arrival variability, service requirements, resource availability and queue discipline influence waiting. Port-accessibility modelling also shows why vessel characteristics, berth availability, access policies and hydrodynamics need to be considered together (Bakker et al., 2024).

Validation must distinguish calibration from independent evidence. If a service rate is fitted to an observed queue, reproducing that queue is an internal consistency check. Independent validation should use held-out periods, vessel-level waiting times or separately observed service records.

Queue discipline is a separate modelling choice. A first-come-first-served assumption should be checked against eligibility and priority rules, particularly when predicting individual waiting times. An acceptable aggregate fit does not establish that those rules are represented correctly.

The useful question is therefore which operational mechanisms and parameters the available observations can distinguish.

A world-model formulation

An ideal architecture separates four layers:

  1. Arrival process: underlying service demand by vessel class and terminal, together with realised arrivals that can respond to coordination policies.
  2. Service process: berth availability, cargo operations, tug/pilot constraints, access windows and effective service rates.
  3. Waiting state: service intent, readiness and eligibility, alongside anchoring, drifting, offshore holding and participation in a virtual queue.
  4. System state: partly observed backlog, queued workload and service constraints, from which waiting-time and recovery forecasts are derived.

Physical behaviour alone does not establish why a vessel is waiting. Virtual-queue membership also does not make every hour of slow steaming congestion delay. Operational timestamps and service records help define the relevant events and baselines (PCO Guide, 2026).

A world model needs both state transitions and an observation model. One proposed formulation is:

State transition: p(x_{t+1} | x_t, a_t, d_t)

Observation model: p(y_t | x_t, a_t, m_t)

Here, x_t is the operational state; a_t the decision or policy; d_t underlying demand and external conditions; y_t AIS and operational observations; and m_t measurement coverage and quality.

The transition model predicts how demand, queues and service evolve under decisions. The observation model describes how those states appear in the available data. Observation quality affects uncertainty about congestion; a missing position report does not imply that service demand disappeared.

This action-conditioned prediction is consistent with the world-model approach, while the proposed state variables and observation model are specific to the port problem (kori and russo, 2026, ha and schmidhuber 2018).

From prediction to intervention

The operational question becomes:

Given the same underlying service demand and external conditions, how would alternative arrival-coordination, berth-priority or holding policies change waiting time, fuel use and recovery?

Candidate interventions include Just-In-Time speed advice, berth resequencing, priority changes, temporary capacity changes and alternative holding instructions.

For JIT, realised arrival times must be allowed to change. IMO guidance links speed adjustment to the availability of berth, fairway and nautical services at arrival. Holding actual arrivals fixed would exclude part of the intervention’s mechanism (GloMEEP/GIA, 2020).

Causal modelling can help distinguish an arrival surge, a service slowdown and a change in waiting geometry when the evidence and identification assumptions support that distinction. AIS-only forecasts do not establish the cause of a delay or the effect of changing policy (Bakker et al., 2024; Hernán and Robins, 2020).

A policy comparison must therefore state its assumptions about confounding, feasible alternatives and effects across vessels. A synthetic counterfactual evaluates behaviour under the simulator’s assumptions; real-world effects require operational evidence.

Evaluation

An ideal evaluation assesses four levels, distinguishing synthetic reference states from independently observed port-call and service records:

State reconstruction

  • waiting-event precision/recall against a defined service-waiting reference;
  • event-boundary errors, fragmented or merged waits, and waits continuing beyond the observation window;
  • queue-size, queued-workload and waiting-time error;
  • robustness when the queue relocates or AIS coverage changes.

Forecasting

  • probabilistic waiting-time and queue forecasts;
  • recovery-time prediction under an explicit backlog or delay threshold;
  • calibration, interval coverage and forecast error by terminal and vessel class;
  • performance on held-out time periods, ports and policy regimes.

Intervention

  • clearly defined policy comparisons, populations and evaluation horizons;
  • treatment-effect estimates for JIT or berth policies where the evidence supports causal identification;
  • sensitivity to unobserved confounding and unsupported policy assumptions;
  • spillover across terminals and vessel classes.

Impact

  • waiting hours and their distribution across vessels;
  • fuel / CO₂ estimates with explicit operating-mode assumptions and uncertainty;
  • service reliability and recovery;
  • delay displaced beyond the formal port boundary.

Fuel and emissions accounting should cover the relevant approach, holding and service phases. Fewer anchorage hours alone do not quantify voyage-wide savings (GloMEEP/GIA, 2020).

The key question is how much service demand is delayed, which constraints produce that delay, and which feasible intervention would reduce it. A useful congestion estimate should remain informative when the queue changes location.

References